The Dairy Building Restoration Project is winding down, slowly but surely. During the month of April, we finished the rooms on the south side second floor, started work on the south side kitchen, and installed a new driveway, with sidewalks. To see photographs of the work completed in April at the 1855 Dairy Building, please check out our photo gallery or click on the following link: http://bishophillheritage.org/dairy-building-project-photographs-for-april-2015/